Services : Operational Update – July 27th – August 3rdha, 2020 for Hamburg Süd
(Morristown, NJ)…We would like to provide the most recent information on our vessel, terminal and inland operations within North America. This information is subject to change.
Equipment Demurrage and Equipment Detention:
In an effort to provide flexibility and transparency on managing Equipment Demurrage and Equipment Detention during COVID-19, Hamburg Süd will follow the below guidelines:
- Any day a terminal is closed, Hamburg Süd will not count that day as a working day within the customer’s free time period for equipment demurrage or equipment detention.
- If a terminal is restricting empty returns, Hamburg Süd will not count that day as a working day within the free time period for import equipment detention.
- For export detention, if the earliest receipt date changes for a shipment (while the container is in the customer’s possession for stuffing), Hamburg Süd will extend the customer’s detention free time through the new earliest receipt date for the shipment.
- In all cases of the above, when free time expires – Hamburg Süd will bill equipment demurrage and equipment detention per normal procedure
- Any 3rd party expenses (chassis, storage depots, etc.) due to changes of terminal or vessel schedules will not be covered by Hamburg Süd.
Vessel Operations | ||
Service | Vessel Name | Details |
N. America Gulf «» C.& S. America East Coast |
MSC BARCELONA 030 SOUTH |
Delayed due to Tropical Storm Hanna in Houston. Arriving on time in Cartagena on 03-Aug. |
N. America East Coast «» South Africa |
CAPE MANILA 031 SOUTH |
Delayed due to berth congestion in Durban. Schedule recovery under review. |
N. America East Coast «» South Africa |
CITY OF HONG KONG 029 SOUTH |
Delayed due to berth congestion in Durban. Schedule recovery under review. |
N. America West Coast «» Asia/Europe |
MSC ISTANBUL 031 SOUTH |
Delayed due to waiting for crew COVID test result (negative) in Nansha. Arriving on time in Busan on 17-Aug. |
N. America West Coast «» Asia |
SANTA TERESA 031 SOUTH |
Delayed due to port congestion in Prince Rupert. Arriving on time in Shanghai on 25-Aug. |
N. America West Coast «» Asia |
MSC SOLA 031 SOUTH |
Delayed due to port congestion in Ningbo. Arriving on time in Yantian on 18-Aug. |
Terminal Operations | |
Port | Update |
Long Beach | Long Beach Pier A Terminal closure due to reduced volumes from blank sailings.
– Due to low Gate and Terminal volume, Pier A will have the following gate schedule for the next 2 weeks. Monday 27-Jul 0800-1700 open 1900-0400 open |
Port Everglades | Florida International Terminal (FIT)) closure due to reduced volumes from blank sailings:
– Closing on Monday 27-Jul. Port Everglades Terminal (PET) closure due to reduced volumes from blank sailings. – Closing on Monday 27-Jul. and Friday 31-Jul. |
Seattle | SSA Terminal (T18) closure due to reduced volumes from blank sailings:
– Closing on Tuesday 28-Jul. |
Equipment Availability | |
Location | Update |
Vancouver | 20’ and 40’ equipment availability is very limited. |
Midwest | Equipment supply is limited in Kansas City and Minneapolis |
Houston | 40’ equipment availability limited |
Please find additional information at this LINK .
Please contact your Hamburg Süd representative with any questions that you may have.
Our quality Hamburg Süd service can also be found online at WWW.HAMBURGSUD-LINE.COM . We offer online booking, shipping instructions, and quotes as well as track and trace, tariffs and surcharges and schedules.